Layihə Məlumatı
Project
İşəgötürən - İdarə:
DSİ Barajlar ve HES Dairesi Başkanlığı
Layihə Kateqoriya:
Dams and Water Structures
Tarix:
04.11.1983 - 01.01.1992
Məkan:
Turkiye-Türkiye
Layihənin təsviri
PROYAPI Engineering and Consultancy Inc. is involved in the Atatürk Dam and Hydroelectric Power Plant (HPP) project. Located in Şanlıurfa, this project provides energy production, irrigation, and flood control. The dam efficiently utilizes the region's water resources, contributing to agriculture and energy sectors.