Project Information
                                        Project
                                        
                                
                                        Employer - Administration:
                                        
                                TCDD
                                        Project Category:
                                        
                                Railway, Light Rail Systems And Metro Design, Engineering And Construction Supervision Services
                                        Date:
                                        
                                26.10.2016 - 09.08.2022
                                        Location:
                                        
                                Turkiye-Burdur – Antalya
Project Description
PROYAPI successfully delivered survey and engineering services for key railway systems, including long tunnels, viaducts, signaling, catenary, and transformer stations, as part of the Burdur – Antalya High-Speed Railway Line project. Managed by the Republic of Turkey State Railways (TCDD), the project commenced in 2016 and was completed in 2022. This line was designed to enhance Turkey’s high-speed railway network and improve regional connectivity.